Work proceeded on installation of the effluent pipeline along the central virginia electric cooperative easement in project B with two crews (a reduction from the three on the project last month) with a total of 2,393 linear feet of trench excavation and 3,353 linear feet of pipe installed (the trench along the power line easement includes both the 12 inch effluent pipeline and the future 8 inch force main from hypoxic ischemic encephalopathy prognosis ferncliff). In all approximately 54,050 linear feet of pipe has been installed out of 72,750 linear feet. In addition to the two pipeline crews, the directional boring subcontractor was on site installing a section of 12” and 8” pipe under a wetlands area on the CVEC pipeline alignment.


Boring subcontractor (craig nanoxia deep silence 120mm ultra quiet pc fan construction) was on site drilling and pushing the bore under interstate 64 near evergreen road). Work that was planned to be started over this period and shown in the last monthly report was as follows (status shown for each item in brackets):

This budget tracker does not include the costs for easement acquisition (that is purchase costs of the easements). It should be noted that the percentage completed according to the budget is at 60% and the percentage completed according to the schedule is at 54%. This inequality is due to the stored anxiety disorder adalah materials. This will improve as more pipe is installed. Also the last payment application has not been approved and these figures may change.

No issues have arisen that require a “red flag” at this time. As stated in previous reports, obtaining the easements along with delays due to the winter weather are the only issues that may have a negative impact on the schedule and are the issues that anxiety test will need to be monitored closely. The progress made on the easements has lessened this concern, but it is still one to be monitored.

Project A schedule for construction has not been finalized yet since easements have not been finished and dates for access to all of the properties have not been set. Draft timelines have been developed but start dates have not been inserted. These will be updated as these dates become known. Currently is planned anxiety disorder definition to start work in september on project A.

The owner of the property on the north side of I-64 at evergreen road has requested a gate be installed where the pipeline runs along the I-64 ROW to the point where it turns south and under I-64. This owner is concerned of uncontrolled access to this easement. This issue will be reviewed by the louisa county water authority staff to determine the need of a gate at this location.

As reported in the last monthly report, in working on the layout for the aeration cascade at the nanoxia deep silence 4 mini tower computer case outfall at the river, it appears that the alignment of the pipe may be better for both installation and long term care by the LCWA if it is run along an existing ditch line. The LCWA staff visited the nanoxia deep silence site for their input along with the contractor. An alternative design is being developed to determine if it can be completed within the contract amount. The citizen that owns the property has agreed to the change at no additional cost to the county. A design has been developed and approved.

2. A meeting was held on july 9 th with the county attorney and al dorin of KDR real estate services to discuss the use of mr. Dorin’s services in the acquisition of easements and property for the proposed infrastructure improvements. Mr.Dorin has provided a scope summary for the county’s review. Timmons group will provide mr. Dorin with a summary nanoxia deep silence 6 rev b review of parcels impacted by the project and will prepare easement plats where necessary.

3. Plans for projects B, C and D which include pipeline construction in the CVEC easement and north of I-64 along routes 626 and 640 to the effluent discharge point were submitted to VDOT and the thomas jefferson soil and water conservation anxiety attack symptoms nhs district for review and approval. It is anticipated that the remaining pipeline drawings, projects A and E for route 15 and the ferncliff area will be submitted the week of july 15 th .

4. Now that design is nearing completion, pricing verification has been proceeding on plan sets B and C. With the receipt of plan set A late last week we intend on completing pricing verification for all the effluent line late this week. Some final design revisions and adjustments are being made to accommodate constructability issues and to keep overall project costs down anxious meaning in gujarati. We are anticipating to complete all of the pricing verification exercises for plan sets A, B & C within the next two weeks and to have our final price for the effluent line submitted to louisa anoxic event at birth county for incorporation into the comprehensive agreement.

B. Easements: as easement requirements are identified, they are being forwarded to the LCWA (dean rodgers) and andy wade for coordination with property owners. Easement plats will be prepared upon confirmation by property owners for their willingness to grant easement(s). The county is in discussion with KDR real estate services to provide easement and property acquisition services.

E. Environmental evaluations (studies anxiety attack meaning in hindi and report): the desktop environmental review has been completed for all projects included in the PPEA project. The report has not identified any significant environmental permitting, or cultural resources that would adversely impact the project. Field investigations are being performed to delineate wetlands and waters of the U.S. Stream crossing permitting with the COE will be initiated anxiety disorder meaning in bengali upon completion of field investigations.

F. VPDES discharge permit modification: the permit modification is being coordinated by LCWA. Timmons group is coordinating the final configuration of the discharge pipe and structure at the river with the LCWA and their consultant. Timmons group is coordinating the design of a re-aeration structure (stepped aeration) and de-chlorination building with the LCWA and their consultant; the design and construction of these facilities will be an addition to the current agreement.